LNEYA super deep crying treatment using common sense
For ultra-deep cold processing equipment, failure to pay attention to the use of the equipment may cause equipment failure.
Before using the water-cooled ultra-cry cryogenic treatment, it should be checked whether all the valves between the equipments are open, whether all the water tanks are filled with water, whether the fans are reversed, and whether the circulating water pump is running in the correct direction. Open the super deep crying treatment main power supply (the standard power supply is 3-phase five-wire system 380V 50HZ), specifically the water-cooled ultra-deep cold treatment front nameplate. Wuxi Guanya LNEYA reminds everyone that the power supply for ultra-deep cooling must be stable to avoid burning the unit or compressor and pump motor.
First open the ultra-deep cooling treatment cooling switch, then turn on the chilled water pump switch. Since the compressor has a delayed start function, the compressor will automatically run after the delay. At this time, pay close attention to the front control panel to observe the temperature change, as appropriate according to the cooling demand. Perform temperature adjustment. Water-cooled ultra-cry cryogenic treatment During normal operation, the unit operation data should be recorded periodically to facilitate the identification of problems based on data as soon as the unit fails. The ultra-cryogenic treatment itself is provided with multiple protection devices. Once there is a fault, it will start to protect and automatically stop. After the fault is removed, press the reset to operate normally.
When the super-cryogenic treatment is not used, the unit, water pump, insulated water tank and water in the pipeline should be drained, and the equipment should be covered and protected to avoid dust and other debris. Regarding the maintenance of ultra-deep cold treatment, this cannot be ignored. It is necessary to clean the condenser and evaporator after running for half a year. It is recommended to carry out maintenance of the whole machine after one year of operation, and keep it clean and clean regularly.
The instruction manual of the ultra-cryogenic treatment equipment and regular inspection and maintenance are all parts that the user needs to know in order to make the equipment run more efficiently.

Recomendaciones relacionadas
-
500 liter reactor cooler selection instructions
1033The 500 liter reactor chiller is used more in the pharmaceutical industry. Therefore, the user needs to select a regular manufacturer when selecting, and at the same time, understand the features and configuration. For the selection of 500 liter r...
Ver detalles -
LED LCD display thermal test system operation process
939The integrated semiconductor industry has developed rapidly in the past two years, which has driven other industries around it. The chip thermal test system is one of the products. In order to avoid machine failures in the LED liquid crystal displ...
Ver detalles -
¿Qué tipo de enfriador puede elegirse para refrigerar DRX?
1059Which Type of Chiller for Cooling XRD?
Ver detalles -
Description of high and low temperature circulation tank refrigeration process
1361In the process of using high and low temperature circulating tanks, there may be some minor problems due to improper use, and there may be problems in the refrigeration process of Wuxi Guanya high and low temperature circulating tanks, and then we...
Ver detalles