Closed circulation cooling system debugging attention note
Closed circulation cooling system needs to pay attention to some common problems during commissioning. Do a good job in debugging work. LNEYA manufacturers remind users that only when they are ready to work can they be better debugged.
The preparation work before the commissioning of the closed circulation cooling system is an important part of the debugging process, which may affect the progress of the whole debugging process. Generally, it is necessary to pay attention to the leakage detection of the air piping system, and there are detailed regulations on the leakage amount of the equipment. High, medium and low pressure systems, under different pressures, the air ducts have different air leakage per square meter per hour. The second is the visual inspection of the pipeline system. The main content of this work is to inspect the pipeline system to ensure that the various valves on the diffuser, branch pipe and main pipe are fully open to ensure that the pipeline system is in the all-pass state. Furthermore, the preparation of the closed loop cooling system commissioning equipment. Before commissioning, prepare the required test equipment, including the equipment required for testing temperature, humidity, pressure, speed, and speed. The preparation work is often different due to different piping systems and their pre-installation work. This should be noted in this.
It is a closed-loop cooling system. When the pump and the main unit are both turned on, the end-to-end end is used for commissioning, the valve for the end supply and return pipe that was originally turned off is turned on, and the water supply and discharge main pipe and main switch that are opened when the pipe is cleaned are turned off. The bypass valve on the circuit, see if the two-way valve is normal, if there is any problem in the closed circulating cooling system when there is abnormality, there is no electricity, or the coil of the valve has been burned. If the coil is burned, there is no spare part, the valve can be manually used. The switch forcibly opens the two-way valve for commissioning.
In actual work, the heating capacity of the closed circulation cooling system unit changes due to the difference in ambient temperature and the requirement of the winter hot water supply temperature in the refrigeration system. The heating capacity of the unit decreases with the increase of the hot water outlet temperature, and decreases with the decrease of the ambient temperature. The input power under the heating condition increases with the increase of the outlet temperature of the hot water, and decreases with the decrease of the ambient temperature. .
When installing a closed circulation cooling system, the corresponding valve opening adjustment can be performed on this basis, which is very helpful to improve the debugging speed and efficiency and reduce the commissioning cost. On the basis of this, the commissioning personnel continuously learn to continuously debug and make the closed circulation cooling system equipment achieve better running state.
Recomendaciones relacionadas
-
¿Qué hay que tener en cuenta al comprar un frigorífico de temperatura ultrabaja de -150 °C?
1902-150 ° C ultra-baja temperatura del refrigerador se utiliza en la industria, por lo que lo que los usuarios deben prestar atención después de comprar el equipo del fabricante? A continuación, Wuxi Guanya (LNEYA)-150 ° C ultra-baja temperatura refrigerador fabricantes para siempre...
Ver detalles -
Automotive antifreeze test test temperature control system
1616When it comes to car antifreeze, we all know that its main function is to prevent the coolant from freezing and cracking the radiator and freezing the engine cylinder block or cover when we stop in the cold winter. Make the cooling system in the ...
Ver detalles -
Funcionamiento eficaz de la máquina integrada de alta y baja temperatura
1836Para garantizar un funcionamiento más eficaz de la máquina integrada de alta y baja temperatura, debe seleccionar el tipo de equipo adecuado y resolver el problema a tiempo. La selección de máquinas integradas de alta y baja temperatura requiere unos p...
Ver detalles -
How do semiconductor CVD and PVD chillers work?
1709The working principle of the chillers used in semiconductor chemical vapor deposition (CVD) and physical vapor deposition (PVD) processes is mainly to remove the heat generated during the process by circulating cooling water or special coola...
Ver detalles
LNEYA Enfriadoras industriales Fabricante Proveedor