The Following Works Should Be Done Before Starting Industrial Chillers
2. For the compressor unit with water system, carefully check whether the cooling water system and chilled water system have water, and whether the water pressure is normal, whether the pipeline system of cooling water and chilled water is unblocked.
7. Check whether there is leakage in refrigerant system of industrial chiller and whether there is leakage in lubricating oil system.
Recomendaciones relacionadas
-
5P hot and cold water machine installation instructions
1578The 5P hot and cold water machine is used in various industries and is used for cold treatment. So what problems do you need during installation and maintenance? If the 5P hot and cold water unit refrigeration compressor unit does not have vibrati...
Ver detalles -
Instrucciones de uso seguro del baño de temperatura ultrabaja LNEYA
1440Los termostatos de temperatura ultrabaja utilizan más equipos en las industrias farmacéutica y química. Al comienzo del nuevo año, cada operador debe prestar atención a las operaciones de seguridad, y de manera segura y eficiente operar ultra-baja temperatu...
Ver detalles -
Semiconductor production process and testing process temperature control unit
1479LNEYA semiconductor testing process chiller
Ver detalles -
How to solve the lack of cooling capacity of the semiconductor cooling cycle system?
1723The semiconductor cooling cycle system is a device for cooling the heating part of the semiconductor in the refrigeration equipment. It is commonly used to test semiconductor IC parts, automotive electronic parts, optical fiber components, telecom...
Ver detalles
LNEYA Enfriadoras industriales Fabricante Proveedor