The Following Works Should Be Done Before Starting Industrial Chillers
2. For the compressor unit with water system, carefully check whether the cooling water system and chilled water system have water, and whether the water pressure is normal, whether the pipeline system of cooling water and chilled water is unblocked.
7. Check whether there is leakage in refrigerant system of industrial chiller and whether there is leakage in lubricating oil system.
Recomendaciones relacionadas
-
High temperature fault treatment of temperature shock test equipment
1036The whole function of Wuxi Guanya LNEYA thermal shock test chamber is computer controlled. It is a self-developed software with a good operation interface, which makes the operation and monitoring of the user simpler and more intuitive. The mainte...
Ver detalles -
Attention points for the use of rapid thermal cycle test airflow machine
1025The rapid thermal cycling test is a test equipment used in the metal, plastic, rubber, electronic and other material industries. It is used to test the material structure or composite material. It can be tolerated in a continuous environment of hi...
Ver detalles -
Cooling system of liquid-cooled energy storage cabinet-chiller
1131With the development of new energy technology, the application of containerized energy storage systems in new energy, photovoltaic, and electric energy stations has increased. If the temperature of the energy storage battery pack is not well...
Ver detalles -
Análisis de funcionamiento específico Cómo deshumidificar cuando se utiliza un congelador industrial
1205In the process of using industrial freezers, there may be some moisture in the refrigeration system. Therefore, the dehumidification of industrial freezers is very important, so how to dehumidify? When dehumidifying, users who purchase industrial ...
Ver detalles