New energy power car power battery detection system vacuum description
The new energy power vehicle power battery test checks the vacuum pump switch in the closed state before operation; when the vacuum pump is placed horizontally, ensure that the lubricating oil and the oil level line are kept horizontal; whether the sealing rubber pad is damaged; whether the pressure gauge needle is returned to zero. Place the vacuum pump on the indoor floor (safe, stable, and easy to operate). It is forbidden to be placed outdoors, and it is not allowed to be placed on the power battery test of new energy power vehicles. Combine the fluoridation tube, pressure gauge and vacuum pump, unscrew the nut at the fluorination port from the large valve, screw the fluorotube onto the fluoride port, and confirm whether the thimble is in the top position. (It is forbidden to tighten the joint with tools such as pliers). First open the pressure gauge valve, then open the vacuum pump power switch and start vacuuming.
Observe the pressure gauge (low pressure) when vacuuming. Stop the vacuum after the pressure reaches -0.1 MPa (negative pressure). The vacuuming time should be determined according to the size of the model and the vacuum pump. The reference time is 10 to 30 minutes, not less than 5 minutes. And should be based on the pressure value displayed on the pressure gauge. First close the pressure gauge valve and then turn off the vacuum pump power switch. Remove the fluorinated tube from the vacuum pump and tighten the air pump nozzle cap to prevent dust from entering. After vacuuming, the pressure must be checked after the pressure is maintained. The pressure is not more than -0.08MPa. If the pressure is greater than -0.08 MPa, the cause of the leak should be found. The pressure is not more than -0.08 MPa (a small amount of rebound with a pressure of 0.02 MPa is allowed). If the pressure is greater than -0.08 MPa, indicating that there is a leak, find the cause of the leak and repeat the above procedure after solving it.
The new energy power vehicle power battery test confirms that there is no leak point and then opens the small valve spool. When the pressure (low pressure) reaches 0.1 MPa-0.5 MPa, the small valve is closed. When the pressure gauge pointer does not move, the pressure gauge valve should be opened a little to see if there is gas discharge. If there is no gas discharge, the fluorine tube is not connected with the valve. The thimble of the fluorine tube does not open the top core of the valve. . At this point, the vacuuming operation should be repeated (starting from the fourth step). After confirming the end of the pumping operation, quickly remove the fluoridation tube and pressure gauge, and then re-open the small valve and turn it back half a turn. After fully opening the large valve and turning a half turn, immediately tighten the valve back cover nut to prevent the valve core rubber seal from leaking and tighten the nut.
The vacuum state of the new energy power vehicle power battery test has a certain impact on its operation, so we need to avoid these external factors that affect the new energy power car power battery detection system.
Recomendaciones relacionadas
-
Debugging steps of industrial water chiller in chemical industry
1693After completing the installation ofindustrial water chillers in chemical enterprises, certain debugging needs tobe carried out in the early stage ofoperation. Only through careful debugging can we find out whether there arehidden troubles in...
Ver detalles -
Qué hacer si el equipo de la cámara de pruebas de choque térmico no alcanza la temperatura fijada
1980La elección del fabricante de la cámara de pruebas de choque térmico está relacionada con la calidad de la cámara de pruebas de choque térmico. Una vez establecida la calidad, el ajuste de la temperatura del equipo no se cerrará. Qué debo hacer si me encuentro con el...
Ver detalles -
Operation instructions for cooling and heating system of reactor
1736The reactor cold and hot switching integrated machine is a cooling and heating temperature control equipment applied in various industries. How much do you know about the reactor cold and hot switching integrated machine? In the pharmaceutical, ...
Ver detalles -
LNEYA Enfriadoras industriales Fabricante Proveedor










